I
only had one goal for last week so besides making a few quick mug
rugs for gifts, I spent the rest of my quilting time on my Quilt Con
fabric challenge quilt.
This
is how I did:
* Start quilting my Quilt Con fabric challenge quilt. Done and
Finished
This
was my priority. I
was excited to receive a the fat quarter bundle of Windham Artisan
Cotton for the Fabric Challenge. I bought yardage of the White-Aqua
for the background. The improvisational piecing of this quilt was
inspired by the Slice and Insert technique of Jacquie Gering and the
quilts of Irene Roderick. After piecing a collection of units, my
sister Irene encouraged me to make connections between the units and
"Twisted Transistor" was created. It is machine quilted
with a walking foot on my home machine. The deadline for entry is not until October 31,
however, I did not want to be working on it at the last minute. This is
my first time submitting an entry. Now I wait until December to hear
if they accept it to hang in the show.
Here
is “Twisted Transistor”.
Stash
Report for 2023
this
past week- Used: 3yds Added: 0 yds
So
far this year- Used: 77.21 yds Added: 40 yds
Net
decrease 38.21 yds
Sunday
I started working on this week's goals.
Goals
for this week:
1.
Quilt more on “Celtic Fantasy”.
I expect the quilting to take a while. I am echoing the Celtic motifs and have to pause the quilting, jump over so as not to stitch across them and then go back to clip all the jump threads.
2.
Make progress on a UFO- I chose to quilt the “Fall Memories” wall-hanging
3.
Work on fall theme mug rugs for homebound.
Have
a great week and enjoy some time for quilting.